Industrial / Kewdale / 2024
Kewdale Warehouse
A practical working floor upgrade for better light, cleaner traffic paths, and easier daily maintenance.
Area
1,850 m2
Finish
Grind and seal
Location
Kewdale

Brief
What the floor needed to do.
The priority was return-to-service speed and a finish that would tolerate pallet movement, forklifts, and routine cleaning.
Use
Warehouse
Constraint
Operational downtime
Finish
Grind and seal
Program
Staged zones
Scope
The work behind the finish.
- 01
Mechanical preparation and contamination checks
- 02
Local crack and spall repairs
- 03
Clear sealer system
- 04
Cure planning for staged access
Result
A cleaner, brighter slab with a clear maintenance cycle and minimal disruption to operations.